Qingdao KXD Steel Structure Co., Ltd
Qingdao KXD Steel Structure Co., Ltd
Detail Information
Main Market:
North America
, Worldwide
, Africa
, Middle East
, Eastern Asia
, Southeast Asia
, Eastern Europe
, Western Europe
, South America
Business Type:
Manufacturer
, Exporter
No. of Employees:
500~1000
Annual Sales:
150,000,000-160,000,000
Detail Description
Qingdao KXD Steel Structure Co.,Ltd, established in 2002, is a professional manufacturer specializing in steel structure poultry&piggery houses with automatic equipment. With over two decades of development, our company has been committed to providing high quality agricultural building solutions for the clients all around the world.
With high-quality products and good after-sales service, our company has obtained CE certification (EN1090 certificate), ISO 9001, IS0140001, 1S045001 Certificate and WPQR for anticipated appraisal from our clients. The professional technical teams at KXD ensure that every project can be finished perfectly from design to installation. Every product meets international standards for durability, efficiency, and sustainability. Our products have been exported to more than 130 countries and regions around the world, such as America,France,Holland, Australia, Peru, Argentina, Uruguay and the whole of Africa area countries etc.
Dedication to customer satisfaction, combined with its advanced manufacturing processes and rigorous quality control, Qingdao KXD continues to expand its global footprint, delivering reliable and cost-effective steel structure farming solutions that support the global poultry & piggery industry.

production line
PROCEDURE-SUBMERGED ARC WELDING
The production supervisor shall plan the jobs to be welded.
Only the items that are fitted and accepted by QC shall be taken for welding.
Clean the location where the welding has to be done free of dust, oil, grease etc.
Set the wire feed and voltage for welding.
The fillet size shall not exceed more than the smaller thickness of the part unless otherwise specified in the drawing.
The fillet size parameters will be maintained according to the chart displayed in the welding area which is prepared based on GB50661-2011 standard.
After welding, remove the spatters and slag completely.
Grind off the burrs, sharp edges and excessive reinforcements.
Offer to QC for inspection.
PROCEDURE-MIG WELDING
The production supervisor shall plan the jobs to be welded.
Only the items that are fitted and accepted by QC shall be taken for welding.
Clean the location where the welding has to be done free of dust, oil, grease etc.
Set the wire feed and voltage for welding.
The fillet size shall not exceed more than the smaller thickness of the part unless otherwise specified in the drawing.
The fillet size parameters will be maintained according to the chart displayed in the welding area which is prepared based on GB50661-2011 standard
After welding, remove the spatters and slag completely.
Grind off the burrs, sharp edges and excessive reinforcements.
Offer to QC for inspection.
HANDLING & PREPARATION OF MATERIAL PRIOR TO BLASTING
Prior to any work commencing, Tool Box Talk shall be performed by Foreman for every task involved in the automated blasting and manual blasting phase. The working area shall be barricaded with information notices posted to alert passersby of the operation within.
The ID of fabricated steel to be blasted shall be recorded by Foreman on a shift to shift basis for the purposes of traceability.
Raw material steel sections to be blasted shall be craned onto the "in-feed" rack. The "in-feed" rack shall be custom built and level with the rollers of the conveyor. All rigging shall be planned before the list of items. All personnel involved shall be suitable trained and qualified for the job they are doing.
Once the raw material is sat on the "in-feed" rack, it may be cleaned with high pressure air to remove dust in the surface of the item.